How Much Billable Time Is Lost to Sheet Setup and Cleanup?

BizForce A&E thumbnail with an orange hourglass and gears for the blog on billable time lost to sheet setup and cleanup

Sheet setup and cleanup can cost an architecture firm tens of thousands of dollars in billable time every year, about $36,000 for each project architect who spends just 5 hours a week on it at a $150 billing rate, and firms win that time back by tracking it, standardizing templates, and handing production work to dedicated drafters and Revit staff.

Most principals know the feeling. A project architect blocks out an afternoon for design work. Instead, they spend it fixing title blocks, renumbering sheets, and cleaning up tags before a submittal. Nobody logs it as lost time. It just disappears into the project.

This post explains what counts as sheet setup and cleanup, how to measure what it costs your architecture firm, and how to get those hours back.

What counts as sheet setup and cleanup

Sheet setup and cleanup is the production work that turns a model into a drawing set. It includes:

  • Creating sheets and placing title blocks
  • Placing and aligning views
  • Tagging, dimensioning, and cleaning up annotations
  • Updating sheet indexes, revisions, and clouds
  • Setting up plot sets and PDF exports

None of it is hard, but all of it takes time. In small and mid-size firms, project architects and engineers usually do it themselves, because there’s no one else to hand it to. Near a deadline, it often falls to the most senior person on the project. And because each task feels small, almost no one tracks it.

Hourglass with sand running out, showing the time pressure that makes an accounting firm turn away clients in busy season

How to measure the billable time you’re losing

You can’t fix what you don’t measure. For two to four weeks, give sheet setup and cleanup its own task code in your timesheets. Ask project architects and engineers to log it separately from design work.

Then do the math. Here’s a simple example to show how it adds up:

  • A project architect spends 5 hours a week on sheet setup and cleanup.
  • Their billing rate is $150 an hour.
  • That’s $750 a week, or about $36,000 a year for one person.
  • Across four project architects, it’s close to $150,000 a year.

Your numbers will be different, so plug in your own hours and rates. The point is that small tasks add up fast. They also pull down utilization, which is already under pressure. A recent analysis of Deltek Clarity data found the median A&E utilization rate fell to 58.9%, its lowest level since 2021. For more on this, see our post on utilization rate.

The hidden costs beyond lost hours

The dollar figure is only part of the cost. When senior staff spend their time on production, design decisions wait, and project schedules slip. Drawing sets get finished in a rush, which leads to inconsistent sheets and more redlines. Principals and project managers have less time for client meetings and business development. Over time, talented architects get frustrated doing work below their skill level, and that raises the risk of burnout and turnover.

How to win that time back

Start with strong Revit templates and CAD standards, so every project begins from a clean base instead of a copied file full of old settings. Add a short sheet setup checklist so the steps are the same every time. Batch cleanup work at set points in the schedule rather than fixing tags and views one by one.

The biggest gain comes from changing who does the work. Production tasks don’t need a licensed architect. Moving them to dedicated drafters or Revit staff keeps your architects and engineers on billable design work.

A simple split works well:

  • Hand off: sheet creation, view placement, annotation cleanup, sheet indexes, and plot sets.
  • Keep in-house: design decisions, code review, client coordination, and final QA and stamping.

If you’re heading into a busy stretch, our guide on how to add production capacity walks through the next steps.

Architecture firm owner calculating billable time lost to sheet setup and cleanup, using a calculator and reports

How BizForce helps A&E firms get billable time back

BizForce places dedicated architects, drafters, BIM and Revit staff, and engineers, based in the Philippines, with U.S. A&E firms. Each professional works only for your firm, in your systems, under your managers. They follow your templates and CAD standards, and with an average of 5 years of experience, they can take on sheet setup and drawing production without a long ramp-up.

You interview and choose each professional before any commitment, and BizForce’s client success team stays involved after the start. BizForce works at a flat hourly rate, with no long-term contracts and no placement fees, so you can add production help without adding a full-time in-house hire.

What makes this model work for drawing production is consistency. Many drafting services send your sheets to whoever is free that day. Each person sets up views, tags, and sheet numbers a little differently, so the set comes back inconsistent and your architects end up cleaning it up again, which defeats the purpose of handing it off.

A BizForce drafter is one person who works only on your projects, inside your own Revit and CAD files. That changes how the work improves over time:

  • Your redlines stop repeating. When the same person receives your markups, they apply the fix going forward, so the same comment doesn’t show up on the next set.

  • You can see the work as it happens. Because they work in your systems, your project architects can open the model, check progress, and give feedback the same day, without waiting for files to come back.

  • Knowledge stays with your firm. The person who knows how your sheets should look isn’t rotated to another client after a few weeks.

The result is that sheet setup becomes routine production work instead of a recurring cleanup job, and your architects spend their hours on design, coordination, and client work that actually moves the project forward.

Frequently asked questions

Is sheet setup billable time?

It can be billed to the project, but it’s usually low-value time when a senior architect does it. The goal is to have it done by someone whose rate fits the task.

What drafting tasks can a remote drafter handle?

Sheet creation, title blocks, view placement, annotation cleanup, sheet indexes, revisions, and plot sets, all inside your Revit or CAD files.

How do Revit templates reduce cleanup time?

Good templates set up title blocks, view types, and annotation styles in advance, so there’s less to fix on every project.

How do we track non-design time on projects?

Add a separate task code for production work and review it for a few weeks. The pattern usually shows up quickly.

Your architects should be designing, not renumbering sheets. See how BizForce can help your firm get billable time back.

Share:

Related Blogs

Ready to evolve your workforce?

Schedule a free 15-minute call. No pressure, no commitments — just a real conversation about whether we're the right fit.